A quote is the client’s first real look at what they’re paying for and what they’re getting. When it only lists a price for new doors, everything else, materials, labor, hardware, add-ons, gets filled in by assumption. And assumptions are where change orders and awkward mid-project conversations come from.
A complete quote does more work than a low one. It sets the scope once, clearly, so there’s nothing left to renegotiate later.
This picks up where the pre-order questions leave off. Once you know the measurements, condition, and scope of a project, the quote is where that information gets translated into a number the client can actually evaluate.
Door and Drawer Front Costs
This is the obvious line item, but it should be specific, not a single lump sum. Break it out by species, finish, style, and quantity, with a per-unit and total cost. A client who can see how the number was built is far less likely to question it later than a client looking at one flat figure.
On the quote
Broken out by species, finish, style, and quantity, with a per-unit and total cost.
Box Refacing Materials
Refacing isn’t just new doors. It’s also matching veneer or panel material applied to any exposed box surfaces, ends, sides, or visible framing, so the new fronts blend with what’s underneath. This is easy to leave off a quote because it’s not the headline item, but skipping it leaves a real cost unaccounted for once the job starts.
On the quote
Matching veneer or panel material, listed as its own line.
Hardware
Hinges, drawer slides, and pulls or knobs should each be addressed directly: what’s included, what’s an allowance, and what the client is expected to source themselves. Vague hardware language is one of the most common sources of a change order, because “hardware included” means something different to every client until it’s spelled out.
On the quote
Hinges, drawer slides, and pulls or knobs: included, an allowance, or client-sourced.
Labor, Separate From Materials
Install labor for doors, drawer fronts, and veneer application should be its own line, distinct from the cost of materials. A client who can see labor and materials separately understands what they’re paying for the work itself, not just the parts, and it gives you a clean place to account for anything that adds install time.
On the quote
Install labor on its own line, distinct from the cost of materials.
Anything Beyond the Core Scope
If the project includes crown molding, a new toe kick, end panels, valances, or filler strips, those need their own line items too. If it doesn’t include them, say so directly. The goal is the same either way: nothing about the scope should be left for the client to guess at.
Add-Ons Worth Offering, Priced Separately
Soft-close hinge upgrades, glass-ready doors, and similar add-ons belong on the quote as optional line items, not folded into the base price. Pricing them separately lets a client say yes to what they actually want without renegotiating the whole quote, and it’s an easy way to add value to the project without adding confusion to the number.
What's Explicitly Not Included
A refacing quote should also say what it doesn’t cover: countertops, plumbing, electrical, or anything outside the cabinet scope that a client might otherwise assume is bundled in. A clear boundary here does as much to prevent a dispute as anything you actually include.
A Misconception Worth Correcting
Some clients, and some less experienced pros, treat a single price for new doors as a complete quote. It isn’t. A refacing project is materials, box work, hardware, and labor together, and a quote that only prices one of those isn’t a quote for the project, it’s a quote for part of it. Being upfront about that from the first number you give a client is what keeps the final number from feeling like a surprise.
Say it like this
“A refacing quote is four things together: doors and drawer fronts, box materials, hardware, and labor. If a number only covers one of those, it isn’t the project price yet.”
Why This Prevents Change Orders
Every line item you include is one less thing left open to interpretation once work starts. A vague quote doesn’t just risk a dispute, it invites one, because it leaves room for the client and the contractor to have reasonably assumed different things. A detailed quote closes that gap before it opens.
Use the Checklist Before You Send a Quote
Run the attached checklist against your quote before it goes out, so every line item above gets a deliberate yes or no instead of an accidental omission.
For pros · Quote review tool
Refacing Quote Line-Item Checklist
1 page · PDF
Check each item once it’s addressed on the quote, either included with a price or clearly marked as not included. Nothing should be left blank.
01 What’s normal
- Broken out by species, finish, and style
- Quantity confirmed for doors and drawer fronts
- Per-unit cost and total shown, not one lump sum
02 Box Refacing Materials
- Matching veneer or panel material included
- Exposed ends, sides, and framing accounted for
- Listed as its own line, not folded into door cost
03 Hardware
- Hinges specified: included, allowance, or client-sourced
- Drawer slides specified
- Pulls or knobs specified
04 Labor, Separate From Materials
- Install labor listed as its own line
- Veneer application labor included, if applicable
05 Beyond the Core Scope
- Crown molding marked included or not included
- Toe kick marked included or not included
- End panels marked included or not included
- Valances and filler strips marked included or not
06 Add-Ons, Priced Separately
- Soft-close hinge upgrade priced as an option
- Glass-ready doors priced as an option
- Any other client-requested upgrade priced on its own
07 What’s Explicitly Not Included
- Countertops noted as outside scope
- Plumbing noted as outside scope
- Electrical noted as outside scope
- Any other out-of-scope work called out directly
08 Quote Notes
- Space for job-specific notes and exclusions
Before you send it
If a client could reasonably ask “is this included?” about anything on the job, and the quote doesn’t already answer it, that’s the item to fix before the quote goes out.
Get the checklist
Want This Ready Before Your Next Quote Goes Out?
Once the scope is locked in, Cabinet Doors Plus can help with trade pricing on the doors and drawer fronts themselves, and support if you need to talk through measurements or options before the numbers go final.
Once the scope is locked in, Cabinet Doors Plus can help with trade pricing on the doors and drawer fronts themselves, and support if you need to talk through measurements or options before the numbers go final.